| 22 May  2014 | |||
|   Assembled X Axis and finished Top Frame. | |||
| [[File:MendelMaxBaseXaxis.png]] | |||
| 20 Jun  2014 | |||
|   Assembled blets for Y and X Axis, screws for Z, wired in electronics and test motion and end stops. | |||
| [[File:MendrelMaxAss01.png]] | |||
| [[File:MendrelMaxAss02.png]] | |||
| 1 Sep 2014 | |||
|   First Excrement (print) was done. Hurray!! The heated bed needs to be installed and system calibrated. | |||
| [[File:MendrelMaxFirstPrint01.png]] | |||
|   Trent W. forged the head bracket. | |||
| [[File:MandelMaxHeadBracket01.png]] | |||
Latest revision as of 02:52, 3 September 2014
Return to Projects Projects
8 May 14
Parts came in
Status as of 14 May 14
Parts are in, started assembly.
14 May  2014
Assembled Top Frame.
22 May  2014
Assembled X Axis and finished Top Frame.
20 Jun  2014
Assembled blets for Y and X Axis, screws for Z, wired in electronics and test motion and end stops.
1 Sep 2014
First Excrement (print) was done. Hurray!! The heated bed needs to be installed and system calibrated.
Trent W. forged the head bracket.