Mendrel Max 2.0
Jump to navigation
Jump to search
Return to Projects Projects
8 May 14
Parts came in
Status as of 14 May 14
Parts are in, started assembly.
14 May 2014
Assembled Top Frame.
22 May 2014
Assembled X Axis and finished Top Frame.
20 Jun 2014
Assembled blets for Y and X Axis, screws for Z, wired in electronics and test motion and end stops.
1 Sep 2014
First Excrement (print) was done. Hurray!! The heated bed needs to be installed and system calibrated.
Trent W. forged the head bracket.