Mendrel Max 2.0: Difference between revisions

From MAGLab
Jump to navigation Jump to search
No edit summary
No edit summary
 
(19 intermediate revisions by the same user not shown)
Line 2: Line 2:


8 May 14
8 May 14
  Parts came in


Parts came in
[[File:MendrelMaxParts.png]]
[[File:MendrelMaxParts.png]]




Status as of 14 May 14
Status as of 14 May 14
  Parts are in, started assembly.


Parts are in, started assembly.
[[File:MendrelMaxBase.png‎]]


[[File:MendrelMaxBase.png]]


14 May  2014
14 May  2014
  Assembled Top Frame.


[[File:MendrelMaxBaseTopFrame.png]]
[[File:MendrelMaxBaseTopFrame.png]]


Status as of 4 Feb 13


Parts are in, looking for instruction book (with passwords).
22 May  2014
  Assembled X Axis and finished Top Frame.


[[File:Keycard EntryCs.png]]
[[File:MendelMaxBaseXaxis.png‎]]
 
 
20 Jun  2014
  Assembled blets for Y and X Axis, screws for Z, wired in electronics and test motion and end stops.
 
[[File:MendrelMaxAss01.png‎]]
 
 
[[File:MendrelMaxAss02.png‎]]
 
 
1 Sep 2014
  First Excrement (print) was done. Hurray!! The heated bed needs to be installed and system calibrated.
 
[[File:MendrelMaxFirstPrint01.png‎]]
 
  Trent W. forged the head bracket.
 
[[File:MandelMaxHeadBracket01.png‎]]

Latest revision as of 02:52, 3 September 2014

Return to Projects Projects

8 May 14

 Parts came in

MendrelMaxParts.png


Status as of 14 May 14

 Parts are in, started assembly.

MendrelMaxBase.png


14 May 2014

 Assembled Top Frame.

MendrelMaxBaseTopFrame.png


22 May 2014

 Assembled X Axis and finished Top Frame.

MendelMaxBaseXaxis.png


20 Jun 2014

 Assembled blets for Y and X Axis, screws for Z, wired in electronics and test motion and end stops.

MendrelMaxAss01.png


MendrelMaxAss02.png


1 Sep 2014

 First Excrement (print) was done. Hurray!! The heated bed needs to be installed and system calibrated.

MendrelMaxFirstPrint01.png

 Trent W. forged the head bracket.

MandelMaxHeadBracket01.png